Structural Strengthening Project



Phase 7 begins the installation of galvanized external steelwork for our Brewster & Maltings structural strengthening project. A 12-ton load will arrive on-site, ready for external installation. An additional 100 tonnes of galvanized structural steel will follow, completing the external strengthening of both 13-story apartment blocks.
All of the supplied steelwork has been manufactured to comply with the requirements of BSEN 1090-2 and UKCA certified at our factory in Ollerton, Nottinghamshire. To see more of what we do have a look here.